< back | home > diamond projects overview > tshikapa river project

 

 
 

Project Status: On Hold
Exploration Stage:
Advanced Exploration
Location: West of Tshikapa, southwestern DRC
Project Areas: Mvula Milenge, Dier, Yusufu, Ikulu
Operator: Pangea DiamondFields PLC
Licence Area: 127.00 km²

 
   

 

Quick Links

History | Geology | Location | Infrastructure | Exploration

 

 
 

Pangea DiamondFields has eleven exploration and small mine permits in the Tshikapa Diamond Field of the Kasai Occidental Province. Six of these projects are located on the Tshikapa River.

 
 

History
The Tshikapa Diamond Field is situated within the West Kasai Region of the DRC in the Kasai-Occidental Province, within the Congo-Angola diamond province. The Tshikapa Diamond Field lies directly downstream of the alluvial diamond fields of the Lucapa Graben in northeastern Angola.

Production from the diamond field was dominated by the Belgian company Societe Internationale Forestiere et Miniere du Congo (“Forminiere’) until independence in the early 1960’s. Since then, official records of production are sketchy and unreliable as artisanal miners took control of mining in the area. Historical production from the diamond field was primarily sourced from active rivers and alluvial terraces along the river banks and, to a lesser extent, from the Kwango Formation conglomerates.

 
 

Local Geology
The local geology of the Tshikapa area comprises flat Cretaceous sediments unconformably overlying the basement rocks. The Cretaceous sediments are comprised of the Loia and Bukungu Series. The Loia comprises a basal conglomerate dominated with basement clasts followed by arkoses and fine orange-brown sandstones and the Bukungu contains sandstones and local conglomerate. These formations are not diamondiferous. The Loia and Bukungu are overlain by the diamondiferous Kwango Formation. This formation is comprised of a deltaic basal conglomerate succeeded by sandstones. The Kwango Formation is covered by Kalahari Supergroup sands.

 
 

Location & Access
The project is located near the town of Tshikapa in southwestern DRC. Tshikapa has an airstrip, which is serviced by small commercial airline companies and private carriers. In addition, a bush airstrip providing access for relatively large freight aircraft on charter has been established in close proximity to our licence areas by air for personnel and smaller items is the most effective, practical and reliable method of travel within the DRC. The roads in the country are in poor condition and many are impassable. River crossings are often problematic due to the poor state of repair of bridges and ferries.

In order to provide heavy equipment access to both the Tshikapa and Longatshimo River projects, PDF pioneered a 4700 km overland route from South Africa through Namibia and Angola into the Southern DRC. This included the replacement or repair of bridges as well as the construction of new sections of road where these were either in disrepair or in some places, non-existent. Some of the smaller equipment has been flown to Kananga and thereafter driven by road to site.

 
 

Infrastructure
PDF established a new permanent camp in mid-2007 in the Mvula Milenge project area. The camp provides tented accommodation, ablution and mess facilities for 10 staff. Water is obtained from the nearby river and purified for potable purposes. Electricity is provided by a generator.. Access to project areas within the concessions is by motorbike and four wheel drive vehicles as roads are limited.

 
 

Recent Exploration
Exploration commenced in May 2005 on the Mvula Milenge and Nanzambi licenses, on the Tshikapa River. The aim of the exploration programme has been to identify terrace and target areas with sufficient gravels to be classified as inferred resources.

The exploration programme included surface mapping and pitting, sampling and processing as well as classification of gravels. In 2008 a river pumping programme was introduced with the aim of assisting to fund operationg costs. This programme is ongoing.

 
 

Future Exploration
The current advanced terrace exploration programme has been temporarily put on care and maintenance until market conditions improve. Resource areas have been delineated with the intent of starting a bulk sampling operation once the programme is resumed. All permits and related holding costs will be kept up to date.

 
 

Management and Staff
PDF geologists and engineers have closely monitored the development and management of this project. A very small core team of personnel are still on site to manage the pumping project.

 
 

Home | About Us | Diamond Sector | Diamond Projects | Country Facts | Investor Relations | Photo Gallery | Contact | Site Map | Credits

Falcon Cliff, Palace Road, Douglas, IM2 4LB, Isle of Man | PO Box 75, Douglas, Isle of Man, IM99 1EP, British Isles
Email: info@pangeadiamondfields.com | Tel: +44 (0) 1624 63 00 00 | Fax: +44 (0) 1624 63 00 01

Copyright © Pangea DiamondFields PLC 2006 - 2010 | Disclaimer | Terms of use | Privacy Policy
webmaster@pangeadiamondfields.com

 
Country Profile